BHEL HARIDWAR SUMMER TRAINING REPORT PDF

0 Comments

BHEL haridwar tarining report Block IV and Block I INSULATION AND TRAINING REPORT ON INSULATION AND MANUFACTURING PROCESS OF MW TURBO Bhel Haridwar Summer training Report Electronic & communication. SUMMER TRAINING REPORTON FOR BHEL, HARDWAR Submitted in More than a hundred sets of different capacities supplied by BHEL, Haridwar, are. BHEL Haridwar block 2 heavy fabrication, training report by udit_soni. Cnc Report Bhel Haridwar Summer training Report Electronic & communication.

Author: Tygoran Dukora
Country: Guinea-Bissau
Language: English (Spanish)
Genre: Science
Published (Last): 9 January 2010
Pages: 401
PDF File Size: 2.48 Mb
ePub File Size: 5.53 Mb
ISBN: 483-7-67033-228-3
Downloads: 20512
Price: Free* [*Free Regsitration Required]
Uploader: Kajiktilar

This unique construction permits rapid start-up from any thermal state and high rates of load changes of the turboset.

Bajaj institute of technology ,greater noida. The velocity of the steam resulting from this expansion is absorbed in two or more rows of moving blades.

Sir please respond regarding this as soon as possible. Its operations are spread over 11 rtaining plants and number of engineering and service divisions located across the country. If they acknowledge it, they will let you know if any internship opportunities are available.

Mam already i have sent mail to above mentioned BHEL Hyderabad, but i didn’t received any reply from them. Could you suggest me if I should do my internship in the technical field or do some research in BHEL only.

Bhel Haridwar Summer Training Report | Mechanical

Summer Training for B. This sequence is repeated as the steam passes through additional rows of fixed and moving blades. VT starts in various batches in a month. After correction of unbalance for the first critical speed, it should be possible trsining increase the rotor speed beyond the first critical speed without subjecting the rotor to any excessive traibing of vibration at the first critical speed. The district is administratively subdivided into three tehsils i.

Related Posts  AMILO PA 3515 PDF

Bhel Haridwar training ppt

The signal trainjng the EHC actuates the control sleeve via the plunger coil system. I am a 4th year student from mechanical branch. Keval Sushruth Branch Reportt.

The nut at the harivwar of the bolt provides a stop for the bolt in the tripped position and for tripping speed adjustment. The enthalpy of the steam decreases. Sunday 09th of September Multi Valve Engine – Posted By: BHEL is a major contributor of equipment and systems to industries. Hello mam I m electrical engineering final year student.

Friday 04th of March I am mechanical student of 3rd year and I want to do summer training or internship in BHEL bhopal,after my 6th semester so kindly help me that what should I do to get my internship. Dear Mam, I’m perusing my btech final year from mechanical engineering nd have want to go for a six months internship in an automobile sector so can I get any help regarding the info nd the process needed to apply for the company? I am a first year undergraduate electrical engineer from IIT Roorkee.

So, that is the easiest way to get an internship. Share this content on your social channels. At the all, till now BHEL is best in supply and manufacturing products. Blade passage of constant cross-section area.

Related Posts  6SL7 DATASHEET PDF

Tech 5th semester student? Space Elevator Page Link: Hello Sir, i am a btech EE 3rd year student from hbti kanpur.

I wanted to do internship in BHEL could you hharidwar me the procedure how to apply. Ashwini Jadhav Electronics and Communication. In this block Hollow and Solid Blades of Steam Turbines are welded on a disk which is fitted on the rotor. The steam pressure decreases.

Bhel Haridwar Summer Training Report | Mechanical

They don’t generally offer it throughout the year and you need to apply again when they have an internship opening at BHEL Hyderabad. Sir, i am Akshay Student of B. In this block work is divided into four steps namely Bay-1, Bay-2, Bay-3, and Bay The capacity of MW is intended to meet the present indications of the likely power capacity addition target of the 11th plan — of over MW. This large single pressure drop produces high steam velocity which is absorbed in the two rows of moving blades.

Excessively high steam velocity will cause high friction losses in nozzles and blading. Only logged in users can reply. Mam ,I want to pursue internship in vizag bhel.