9100C ANESTHESIA MACHINE PDF

0 Comments

GE Healthcare c Anesthesia Machine Technical Reference Manual Software Revision 1.x Approved −12−9 EET Junmin Ji (Rick) M c Product Data Sheet – GE Healthcare c Familiar, reliable, GE – with over years experience in anesthesia and quality leadership? 53 cm/21 in Depth: 40 cm/16 in Side of machine: cm/45 in Height: The c is the ideal solution for customers seeking an affordable, reliable and easy-to-use anaesthesia system. The c is designed and manufactured in.

Author: Dizuru Gujind
Country: Bhutan
Language: English (Spanish)
Genre: Medical
Published (Last): 1 September 2017
Pages: 227
PDF File Size: 7.51 Mb
ePub File Size: 17.36 Mb
ISBN: 753-1-71577-789-1
Downloads: 60813
Price: Free* [*Free Regsitration Required]
Uploader: Tygojinn

Electrical safety tests Section 3. Transfer harness wire to top and middle tabs; bottom tab open. Resistance to ground less than 0.

GE Healthcare Anesthesia Machine- C, ICU Use, Medical Use | ID:

Make sure that the power failure alarm comes on. Exit the Service Mode and go to Normal Mode. Warnings ahesthesia Cautions tell you about dangerous conditions that can occur if you do not follow all instructions macihne this manual: Ensure the spring hooks are fully engaged into the posts on the manifold and the actuating lever.

To Digital Manometer 3 6. Supply gas pressure regulator 2. Remove your hand or the test plug from the patient connection.

Middle low limit alarm setting. Repair or replace defective parts. Control Sample Board under tabletop. ZIF Connector Type B 3 4 Anwsthesia release the flex cable 3insert a thin slotted screwdriver at the base of the connector and twist it slightly to pry up on the shell of the connector.

Related Posts  LOMINGER FYI PDF

Refer to Section 8. Verify proper alignment of the knob with the setting indicators. Combines clinical performance with ergonomic design to deliver anestheic agents effectively and efficiently. Remove the plug on the test fitting, and attach pressure test device to the test fitting. Turn all flow controls fully clockwise zero flow.

GE Healthcare c Anesthesia Machine Technical Reference Manual | Pepe Guapo –

Remove the pressure test device, test adapter, patient circuit and the manual bag. Connect the calibration pipe C to the small port of flow sensor. The bulb should not inflate in less than 45 seconds. Get Best Price Request a quote. Test the regulator setting per the appropriate test in Section 5. Check the proportioning system concentration increasing N2O flow. Bellows mounting rim loose Remove rim and pop-off valve diaphragm; reseat diaphragm; snap rim into place.

Decreasing the N2O flow from the engagement point rotates the O2 sprocket away on the O2 knob, increasing the O2 concentration. All machine and ventilator parts should be replaced before performing the checks, tests, and calibrations. Secure the outlet tubing with tie wraps.

GE Healthcare Anesthesia Machine- 9100C, ICU Use, Medical Use

Zero the O2 flow. Set the fresh gas or O2 flow to 0. Remove the four screws from the side panels. Mchine that parts are free of dust and dirt.

Multipurpose Anaesthesia Machine- 9100C

It details the following components: Flush the system with O2: A secondary regulator supplies the air flow control valve. The ventilator package consists of: Respiratory Humidifier in New Delhi. All connections have indexed fittings, filters, and check valves one- way valves.

Related Posts  AKTA PERKAHWINAN DAN PERCERAIAN 1976 PDF

Guide the outlet fittings of the valve body into their respective silicone tubes. Note The valve body, o-ring, and flapper do not come out with the block. Look for circuit disconnection. The c is available with both volume control and pressure control ventilation modes. N2O flow does not decrease Defective flowmeter assembly Verify low pressure regulator calibration.

Lift the upper shelf. Attach a gauge to the O2 primary regulator test port. Test the leak test device: Remove the knob assembly from the valve body.

Alarm Message If a User Alarm persists after the recommended action has been performed, the message indicates the probable component and related circuit that needs repair.

At the lower flows, the O2 monitor may take up to 90 seconds to stabilize. The pressure control on the c is genuine pressure control, not pressure limiting common in some other systems.

The flush valve supplies high flows of O2 to the common gas outlet when you push the flush button. Slowly open the cylinder valve for the regulator being tested. The O2 flow must be greater than the minimum limits. Volume Control Pressure Control optional?