CEIG RULES PDF

0 Comments

Fax: E-mail: [email protected] Website: .. ELECTRICAL SAFETY RULES. . Supply repealing the Indian Electricity Rules, vide notification. 3, CEIG – Extra High-High Voltage Electrical Installations-Indian Electricity Rules Pre-commissioning Texts of Electrical Apparatus And Equipments, Act and Rules. The Electricity Act, The Central Electricity Authority ( Measures relating to safety and Electric supply) Regulations, A.P. Cinemas .

Author: JoJogor Nejinn
Country: Barbados
Language: English (Spanish)
Genre: Environment
Published (Last): 8 November 2014
Pages: 393
PDF File Size: 5.29 Mb
ePub File Size: 9.8 Mb
ISBN: 705-8-16179-831-6
Downloads: 13623
Price: Free* [*Free Regsitration Required]
Uploader: Nekora

Clearance from buildings of low and medium voltage lines and service lines: The Consumer, Owner or occupier, the contractor If any or the person through whom the work is being carried out and the person under whose immediate supervision the work is being carried out, shall each be punishable ceit fine which may extend to Three Hundred Rupees. Compliance with rule shall be checked by measuring the insulation resistance as provided below. Additional provisions for supply and use of energy in multi-storeyed buildings more than 15 meters in height: Authorisation — 1 A supplier or a consumer, or the owner, agent or manager of a mine, or the agent of any company operating in an oil-field or the.

TAMIL NADU Electrical Installation Engineers’ Association

Additional provisions cekg supply and use of energy in multi-storeyed buildings more than 15 meters in height: Clearance from buildings of high and extra-high voltage lines: Provided further that where the generator, motor, transformer or other apparatus is within an enclosure, one notice affixed to the said enclosure shall be sufficient for the purposes of this rule. Provided that where it is not possible to affix such notices on any generator, motor, transformer or other apparatus, they shall be affixed as near as possible thereto [or the word “danger” and the voltage of the apparatus concerned shall be permanently painted on it]: Provided that the supplier may energize the aforesaid electric supply lines or apparatus for the purpose of tests specified in rule Clearance xeig buildings rhles low and medium voltage lines and service lines: Installation and testing of generating units: Clearance from buildings of high and extra-high voltage lines: Construction, installation, protection, operation and maintenance of electric supply lines and apparatus: Handling of electric supply lines and apparatus: Precautions to be adopted by consumers, owners, [occupiers], electrical contractor, electrical workmen and suppliers:.

Provided that in the case of works executed for or on behalf of the central Xeig and in the case of installations in mines, oil-fields and railways, the Central Government and in other cases the State G overnment may, by notification in the Official Gazette, exempt, on such conditions as it may impose, any such work described therein either generally or in the case of any specified class of [consumer,Suppliers,Owners or Occupiers],from so much of this sub-rule as requires such work to be carried out by an electrical contractor licensed by the State Government in this behalf.

Related Posts  GREENLAM LAMINATES CATALOGUE PDF

All ducts provided for power cables and other service shall be provided with fire-barrier at each floor crossing.

Penalty for breach urles rule 45 — Where any electrical installation work of the nature specified in sub rule 1 of rule 45 has been carried out otherwise than —. Provided that the provisions contained in this sub-rule shall have effect in respect of the person already authorised to operate or undertake maintenance of any part or whole of generating station as aforesaid from the date to be specified by the appropriate Government, but such a date shall not be later than a period of [6 years, 2 months from the date this rule comes into force.

Authorisation — 1 A supplier or a consumer, or the owner, agent or manager of a mine, or the agent of any company operating in an oil-field or the owner of a drilled well in an oil-field or a contractor for the time being under contract with a supplier or a consumer to carry out duties incidental to the generation, transformation, transmission, conversion, distribution or use of energy may authorise any person for the purpose of any or all of the following rules, namely — Sub-rule 2 of rule 36, clause a of sub-rule 1 of rule, 51, clause a of sub-rule 1 [and [clause e and f of sub-rule clause a of sub-rule 2 ] or Rule 64 sub-rule 2 of rulesub-rules 1 and 4 or rulessub-rule 4 of rulefeig and sub-rule 8 of rule Provided further that where the generator, motor, transformer cfig other apparatus is within an enclosure, one notice affixed to the said enclosure shall be sufficient for the purposes of this rule.

Provided that no consumer or occupier shall commission his generating plant of a capacity exceeding 10KW without cfig approval in writing of the Inspector]. Penalty for breach of rule 45 — Where any electrical installation work of the nature specified in sub rule 1 of rule 45 has been carried out otherwise than —.

Authorisation – 1 A supplier or a consumer, or the owner, agent or manager of a mine, or the agent of any company operating in an oil-field or the owner of a drilled well in an oil-field or a contractor for the time being under contract with a supplier or a consumer to carry out duties incidental to the generation, transformation, transmission, conversion, distribution or use of energy may authorise any person for the purpose of any or all of the following rules, namely – Sub-rule 2 of rule 36, clause a of sub-rule 1 of rule, 51, clause a of sub-rule 1 [and [clause e and f of sub-rule clause a of sub-rule 2 ] or Rule 64 sub-rule 2 of rulesub-rules 1 and 4 or rulessub-rule 4 of rulerule and sub-rule 8 of rule Handling of electric supply lines and apparatus: The supply of energy shall not be commenced by the supplier unless and until the Inspector is satisfied that the provisions of Rules 65 to 69 both inclusive have been complied with and the approval in writing of the Inspector has been obtained by him: Precautions against leakage before connection: Compliance with rule shall be checked by measuring the insulation resistance as provided below.

Related Posts  MAHALLUL QIYAM PDF

Provided that the provisions contained in this sub-rule shall have effect in respect of the person already authorised to operate or deig maintenance of any part or whole of generating station as aforesaid from the date to be specified by the appropriate Government, but such a date shall not be later than a period of [6 years, 2 months from rulee date this rule comes into force.

The supply of energy ceib not be commenced by the supplier unless and until the Inspector is satisfied that the provisions of Rules 65 to 69 both inclusive have been complied with and the approval in writing of the Inspector has been obtained by him: Such tools and devices shall always be maintained in sound and efficient working conditions].

Such tools and devices shall always be maintained in sound and efficient ruless conditions].

Medias this blog was made to help people to easily download or read PDF files. Precautions against leakage before connection: The Consumer, Owner or occupier, the contractor If any or the person through whom the work is being carried out and the person under whose immediate supervision the work is being carried out, shall each be punishable with fine which may extend to Three Hundred Rupees.

WELCOME TO CEIG

Provided that the supplier may energize the aforesaid electric supply lines or apparatus for the purpose of tests specified in rule Precautions to be adopted by consumers, owners, [occupiers], electrical contractor, electrical workmen and suppliers: Provided that an Inspector may direct such owner to carry such tests as he deems necessary or, if he thinks fit, accept the manufacturer’s certified tests in respect of any particular apparatus in place of test required by this sub-rule.

Installation and testing of generating units: All ducts provided for power cables and other service shall be provided with fire-barrier at each floor crossing. Provided that no consumer or occupier shall commission his generating plant of a capacity exceeding 10KW without the approval in writing of the Inspector].

Construction, installation, protection, operation and maintenance of electric supply lines and apparatus: Provided that in the case of works executed for or on behalf of the central Government and in the case of installations in mines, oil-fields and railways, the Central Government and in other cases the State G overnment may, by notification in the Official Gazette, exempt, on such conditions as it may impose, any such work described therein either generally or in the case of any specified class of [consumer,Suppliers,Owners or Occupiers],from so much of this sub-rule as requires such work to be carried out by an electrical contractor licensed by the State Government in this behalf.